CPH Tube Station Design Optimisation

Infrastructure

CPH Tube Station Design Optimisation

About this project

In summer 2017 AVILAStudio was appointed by Andermann Engineering for technical assessment of Claims 148 & 248 and FE analysis of four Cityringen tube stations in Copenhagen (opened 2019), assessing retaining walls downgraded to temporary structures.

Scope

Redesign of underground RC boxes under temporary pile assumptions. Retaining wall suitability assessed against surveyed conditions, mechanical properties and environment. Technical consultancy for detailed design of tube station shafts.