Education & sport
Brighton College
About this project
While working as a project team leader at Fluid Structures Ltd, Antonio was involved in the full construction package and RC detailing of the Brighton College new Kai Yong Yeo Building — an academic building comprising 22 classrooms and an experimental room with offices and other spaces for students and staff.
Scope
Main services covered full structural engineering design and reinforced concrete detailing of the building structure, including the steel arches that complete the characteristic roof of the academic building. The structure was completed in summer 2017 and the building is now operational.