Brighton College

Education

Brighton College

About this project

As project team leader at Fluid Structures Ltd, Antonio led the construction package and RC detailing of the Kai Yong Yeo Building — 22 classrooms, experimental room, offices and student/staff spaces.

Scope

Full structural design and reinforced concrete detailing, including the steel arches of the characteristic roof. Completed summer 2017; building operational.